State Route 15/6015 – Mansfield, PA

Owner

PADOT

Completion Date

2004

Paving 16.6 kilometers of double lane highway, which used approximately 225,000 metric tons of asphalt, was required for this job.   The project also encompassed 8 structure rehabilitations, which included design and reconstruction of 4 of the bridge decks and parapets, a 2,400 MM pipe culvert, and a 6,000 MM x 1,800 MM box culvert.

Loading...