State Route 220 Bridge – Sayre/Athens, PA

Owner

PADOT

Completion Date

2008

This job included bridge deck repair, scarification, joint cleaning/sealing, painting and new guide rails.  Roadwork included drainage, base repairs, milling, patching, sawing & sealing overlays and, finally, repaving over a 5-mile stretch of highway.

Loading...